Follow the circuit.
Exercise the complete design. Select any component to inspect its inputs, outputs and candidate parts.
Make the physical limits visible.
Compare charging supplies, follow one-gamepad routing and test the time available to discharge contacts. These are design calculations; hardware parts and firmware still need validation.
What still needs real hardware?
Controller power: select the 5 V converter, reverse blocking, current-limit parts and actual cells. A TPS22919 switch alone does not satisfy that design.
Detached input: implement and test left-half aggregation, pairing and reconnect. Mixed docking is deliberately gated pending handover design.
Undocking: select switches and discharge parts, then measure voltage against latch travel. RC predictions do not prove backfeed isolation.
Main pack: qualify chemistry, charge voltage and protector tolerance together. No cell is approved by this simulation.
Packaging: battery and controllers share one layer under the keyboard. Verify the full tolerance stack with supplier drawings and physical fit.
Phone and radio: measure USB data-role behavior, switch-to-screen latency and radio coexistence on Seeker. Wired HID remains unverified.
Find the weak link.
Available end-to-end paths & component failure impact
Click a component to fail it open. Losses are relative to the current conditions with no open-node fault.
Assumption sensitivity · 27 operating corners
Efficiency 85 / 90 / 95%; pack resistance 40 / 80 / 160 mΩ; bridge resistance 25 / 50 / 100 mΩ. Other controls stay fixed.
Experiment notebook
Add a physical measurement (optional)
Enter a real bench observation with its instrument and test conditions. Saving an observation does not calibrate or validate the model automatically.
Select a saved run to compare or restore its controls.
Keep access or open this notebook on another device
Your private recovery key grants read/write access. It stays in this browser unless you copy it. Save it before clearing browser data.
Manufacturer evidence & physical validation plan
Still needs measurement
No bench measurements are preloaded. Model passes are not hardware qualification.
Exercise the keyboard and both controllers Local inputs or a paired device
Input → output trace
0 msWhat this model means
Power routing, interlocks, matrix ghosting, input timing, ADC quantization and deadzone are executable. Graph reachability, adapter supplement, resistive sag and scheduled reports are executable. Unsourced currents, efficiencies and policy temperatures remain assumptions.
Voltage and SOC sliders set test conditions. Energy counters integrate modeled power over simulation time, but SOC and temperature do not evolve. ESD, radio propagation, USB negotiation, mechanical loads and charge transients are not solved; contact discharge has a separate first-order RC estimate. This is not SPICE, a released schematic, or hardware qualification.
Open detailed circuit calculations ↗